You must discuss/interpret everything you calculate You need to draw final design drawings (not to scale is acceptable but indicate all required dimensions and units of measurements).
Pavement design software circly full#
Flexible 2: Full depth asphalt (E=3000MPa), surface layer asphalt (E=2200MPa).Flexible 1: Unbound granular pavement with thin bituminous surfacing.Summarise and calculate (if required) ALL input parameters for both flexible and rigid pavement designĭesign Task 2: Flexible pavement design (10 marks) Design the following flexible pavement alternatives using empirical or empirical-mechanistic procedures (as applicable, appropriate or preferred!).Other required information can be assumed within Australian Standard (Austroads Guides)ĭesign Task 1: Pavement Design Input Parameters.Annual heavy vehicle growth is 1% throughout the design period.Heavy vehicles = 8% (if the last four digits of your student ID is Subgrade CBR value = 3% (if the last four digits of your student ID is Two-way total AADT =, rounded to nearest 10.The following are the project specific information supplied by the client (Road Authority in Victoria): Geometric design, earth moving and subgrade evaluation of a new two-lane two-way road has been recently completed and now it is time for design of pavement in Victoria. Use of CIRCLY software (pavement design software) is highly recommended when required.
It develops students' ability to understand Australian pavement design system, materials and tests and design of alternative pavement configurations (flexible pavements, rigid pavements and structural overlays) using current Australian Guidelines and Design Practices. Objectives This assessment item relates to the unit learning outcomes 3, 4, 5 and 6.